Thursday, July 9, 2015

Tanks are sitting complete, Ailerons again

It does feel good to be done with the tanks for now. In the back of my mind though is the thought that I still am yet to leak test, and I have the potential to have to cut access panels and more proseal. But for now let's put those thoughts to rest :)

Before deciding to move on to the tanks I made the decision to build a new right aileron as I was not happy with the way the trailing edge rivets came out. In my attempt to remove them the holes began to enlarge and I realized this was a losing battle.   The left aileron was 50% complete before putting things away.

So I am back at it, and am starting with the left aileron. I should have a positive future update.